Type 4 Main Water Corridor

-

Type 5 Community Pedestrian Street

Flexibility and temporality accounts for a huge part of this type. Preparation projects such as extending paved sidewalks and enlarge planter size happnens at phase 2.  AV station combined with bike racks become the new center of the streets. Permeable and elevated paving enables water flow to enter the pocket park.

Type 6 Hydrophilic Pedestrian Street

-